UK (2)
-
Solar PV Feasibility Study Consultancy for the Office and Residential Properties at the British High Commission Lusaka
Description: Consultancy services for the delivery of a comprehensive Solar PV Feasibility Study for the British High Commission Lusaka estate, including the Chancery, the High Commissioner's Residence and designated staff residential properties. The scope includes site assessments, energy demand analysis, solar PV generation modelling, battery storage and energy resilience assessment, financial and economic appraisal, options analysis, and the provision of a final feasibility report with recommendations to support future procurement and implementation of solar energy solutions. ...
(Retrieved from: https://www.find-tender.service.gov.uk/Notice/103213-2026) -
Supply and Installation of New Roofs
Description: Introduction
(Retrieved from: https://www.find-tender.service.gov.uk/Notice/103009-2026)
Swindon Borough Council (SBC) has a housing stock of around 10,500 homes which it manages in the capacity of a social landlord. It consists of a range of different dwellings including houses, flats in blocks both low and medium rise, sheltered and non-sheltered schemes, and construction types consisting of pitched tile roofs and flat roofs to the different property types (houses & blocks).
A contract for the replacement of roofs and installation of solar panels is to be awarded for a term of up to five years with the successful contractor undertaking planned programmes of using ... ...
EU (6)
-
Czechia – Solar photovoltaic modules – Installation of new photovoltaic power plants in the ČEPRO, a.s. areas
Description: The subject of Section 1 is the construction, installation, commissioning, and full commissioning of a photovoltaic power plant with a capacity of 499.5 kWp in the premises of the client's warehouse in Nové Město (Břežany I 62, 280 02 Břežany I), including complete provision of UPOS and UTP, preparation of documentation for the execution of the work and documentation of the actual execution of the work, and provision of cooperation to the client for obtaining a grant and for dealings with ERÚ. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/754559-2026) -
Poland – Solar photovoltaic modules – „Construction of a photovoltaic installation for electric buses within the municipal transport base”. The order will be implemented as part of the project: „Improving public transport in the Northern Functional Area of the City – purchase of ecological rolling stock and modernization of transport infrastructure” co-financed by the European Regional Development Fund (...)
Description: The main scope of the order includes: Construction of a photovoltaic system with a power of 149.94 kWp with an energy storage system with a power of 200 kW and a minimum capacity of 500 kWh. Photovoltaic modules with a power of 490Wp each in a quantity of 306 pcs will be mounted on a system-based freestanding structure. The photovoltaic system will be equipped with three hybrid inverters, each with a power of 50 kW. The system will be equipped with AC and DC distribution boards along with protections. Cable routes for AC, DC and communication will be executed. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/752912-2026) -
Poland – Building construction work – Termomodernizacja budynków Zespołu Szkół nr 4 w Jarocinie
Description: The subject of the contract is thermomodernization and modernization of the buildings of the Jarocin School Complex No. 4, including the school building and the kindergarten building. The buildings are located in Jarocin at Maria Curie-Skłodowska Street 4 and 2A. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/754389-2026) -
Poland – Solar panel roof-covering work – Execution of design and construct of photovoltaic installations with energy storage facilities on the high part of the roof of the Ministry of Finance building
Description: 2.1 The subject of the contract is the execution of the delivery and installation of photovoltaic installations including energy storage facilities on the high part of the roof of the Ministry of Finance building in the design and construct method; 2.1.1 The subject of the contract includes: 2.1.1.1 Development of Project Documentation in the scope of: 2.1.1.1.1 Technical Project; 2.1.1.1.2 Architectural and Constructional Project; 2.1.1.1.3 Land Use Plan – if required. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/755217-2026) -
Romania – Construction work – Design services, technical verification, technical assistance from the designer during the execution of the works and execution of the construction and assembly works corresponding to the project "Energy Efficiency Gymnasium Alexandru Davila - Block C1"
Description: Services of design, technical verification, technical assistance from the designer during the execution of the works and the execution of the construction-montage works pertaining to the project „Energy Efficiency School Alexandru Davila-Corp C1”. The design, technical verification, technical assistance from the designer, and execution of the construction-montage works for the investment objective „Energy Efficiency School Alexandru Davila-Corp C1” will be carried out in accordance with the requirements of the statement of work, the documentation for the approval of the intervention works ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/754285-2026) -
Romania – Solar panel roof-covering work – "Technical project preparation services, DTAC, execution details, technical project designer assistance, technical verification and work execution for the investment objective "INFRASTRUCTURA DE PRODUCERE A ENERGIEI REGENERABILE PENTRU SPITALUL ORASENESC TARGU BUJOR"
Description: "Technical project preparation services, DTAC, execution details, technical designer assistance, technical verification and work execution for the investment objective “INFRASTRUCTURE FOR PRODUCING RENEWABLE ENERGY FOR THE TARGU BUJOR CITY HOSPITAL” The duration of the technical project preparation, execution details, DTAC, and technical design assistance services, as well as the technical documentation necessary for obtaining Approvals/Agreements/Authorizations, shall be 60 days from the Service Commencement Order. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/754717-2026)