UK (1)
-
T.2026.35_Solar Panels at Pathfinder House
Description: Huntingdonshire District Council (HDC) is letting a contract for the provision of Roof mounted solar to be installed at HDC's head office, Pathfinder House. This will include the supply and installation of the solar panels as well as the connectivity and ability to view energy production on either Solar Edge or SolisCloud.
(Retrieved from: https://www.find-tender.service.gov.uk/Notice/102851-2026)
Contract 1. Installation of Solar Panels at Pathfinder House
Supplier: Aspect Group Services Ltd
Contract value: £59,166.95 excluding VAT £71,000. ...
EU (12)
-
Croatia – Construction work for school buildings – Radovi izgradnje PŠ Josipa Generalića Hlebine sa školskom sportskom dvoranom
Description: Construction of a school building with a gross building area of approximately 650 m2 (ground floor and floor, height to the cornice approximately 8.9 m, total height approximately 9.9 m), and construction of an expanded school gymnasium with a gross building area of approximately 200 m2 (height to the cornice approximately 5.5 m, total height approximately 8.5 m). Photovoltaic cells are installed on both objects (installed power - 100.00 kVA). The objects are built on a plot with a total area of approximately 4500 m2. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/749635-2026) -
Czechia – Solar energy – Fotovoltaika v obecních objektech Okrouhlice - design and build
Description: Development of a project, procurement, and installation of solar photovoltaic systems for municipal buildings in Okrouhlice. The applicant informs the participants that reconstruction will take place on the affected roofs to prepare them for the actual installation of FVE. The applicant has divided the fulfillment of the contract into 2 phases. 1. Phase Development of executive project documentation. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/749774-2026) -
Czechia – Solar installation – Installation of PV systems on buildings and land of the City of Bíliny
Description: The subject of the contract in Section 3 is the provision of project documentation including related engineering, supply, and installation of two photovoltaic power plants (FVE) on the roof of ZŠ and SŠ Za Chlumem, including connection of the FVE to the distribution system. The power output of the installed photovoltaic systems is 99.6 kWp and 99.6 kWp.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/751229-2026)
The subject of the contract is the provision of project documentation including related engineering, supply, installation, and commissioning of separate photovoltaic power plants (FVE) within the territory of the town of Bílina. ... -
Czechia – Solar installation – Installation of PV systems on buildings and land of the City of Bíliny
Description: Part 4 – Project and Realization of FVE Construction on the Roof of ZŠ Aléská – Design &Build The subject of the contract in Part 4 is to ensure project documentation including related engineering, supply, and installation of two photovoltaic power systems (FVE) on the roof of ZŠ Aléská, including connecting the FVE to the distribution system. The output power of the installed photovoltaic systems is 79.8 kWp and 82.8 kWp. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/752348-2026) -
Denmark – Construction work – Enghavevej 84
Description: The construction project concerns the refurbishment of the building envelope at Hovedstadens Beredskab Teknik and will be carried out in five phases. Phases 1–3 (fixed works): Replacement of the roof covering, installation of internal insulation and external condensation insulation. Replacement of ridge lights. Refurbishment and partial replacement of facade windows. Minor brickwork repairs. Installation of photovoltaic panels. Phase 4 (option): Replacement of the roof, including sub‑roof boards, and installation of external condensation insulation. Refurbishment of skylights. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/750739-2026) -
Poland – Solar installation – Delivery and installation of a photovoltaic system with energy storage in PP no 24 with documentation - as part of the project: Renewable energy sources in public buildings in Jastrzębiu-Zdroju
Description: The subject of the contract is: Design, delivery, installation, and commissioning of a photovoltaic installation with necessary documentation at Public Kindergarten No. 24 at Aleksandra Fredry 15 in Jastrzębiu-Zdroju with the following parameters: - photovoltaic generator power 19.8kWp (microinstallation within the meaning of the OZE Act) - MEE electrical energy storage with a power of at least 10kW and an useful capacity of at least 20kWh. The photovoltaic installation will be connected to the building's internal electrical installation. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/749533-2026) -
Poland – Solar photovoltaic modules – Investment activities in the construction of the Energy Cluster South Energy Infrastructure – photovoltaic installations, energy storage and hydrogen installation
Description: The order consists of designing, delivering, installing, and commissioning: 1) for Gmina Gnojnik: Residential buildings: a) 140 photovoltaic installations with hybrid inverter and energy storage, b) 5 photovoltaic installations with hybrid inverter without energy storage, c) 14 energy storage installations with hybrid inverter, d) 57 heat pump installations for CO and CWU, Public utility buildings: a) 14 photovoltaic installations with hybrid inverter and energy storage, b) 4 energy storage installations with hybrid inverter, 2) for Gmina Borzęcin: Residential buildings: a) 75 photovoltaic ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/749810-2026) -
Poland – Solar installation – Renewable energy in Gmina Gorzyce, Godów, Kornowac and Radlin - repetition
Description: The subject of the contract is the execution of project documentation and the comprehensive implementation of the investment task titled „Renewable Energy Sources in Gorzyce, Godów, Kornowac and Radlin - repetition”. The task involves designing and implementing the supply, installation, and commissioning of solar photovoltaic systems and energy storage systems in public utility buildings within the territory of the Radlin Gmina. Part 1: Solar photovoltaic systems together with infrastructure for buildings: - PSZOK Building in Radlin - ul. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/750391-2026) -
Poland – Solar photovoltaic modules – Construction of a micro photovoltaic installation on the roof of the Youth Shelter building at Błogocka 24 in Cieszyn as part of the investment task entitled
Description: The subject of the contract is the construction of a photovoltaic microinstallation, consisting of the supply and installation along with the commissioning of a new photovoltaic installation on the roof of the School Youth Shelter at Błogocka 24 in Cieszyn. The detailed description of the subject of the contract is on the page of the conducted procedure namely https://platformazakupowa.pl/pn/cieszyn in SWZ - point 3 - DESCRIPTION OF THE SUBJECT OF THE CONTRACT.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/751762-2026) -
Romania – Overhaul and refurbishment work – EXECUTION WORKS OF REHABILITATION AND MODERNIZATION_3 LOTS: • LOT 1 — „Equipment, modernization and rehabilitation of H.S. no. 7 within the Economic College «Emanuil Gojdu»”, SMIS Code 361379 • LOT 2 — „Equipment, modernization and rehabilitation of H.S. Ec «EG» – High School Block”, SMIS Code 361396 • LOT 3 — „Rehabilitation, modernization and equipment of H.S. «EG» — No. 3 Gen. School, Hunedoara”, SMIS Code 361376
Description: The building (construction 1965, height regime with 3 levels, total above-ground height 13.92 m, built-up area 778 sq m, total developed area 2,334 sq m) falls, according to the Technical Expertise no. 121/2025 (eng. Dan Munteanu, certified technical expert MDLPA), into the importance category „C” (normal) and the importance class „II”. The structural frame falls into seismic risk class III; the proposed works aim to equip, modernize, and rehabilitate the building and DO NOT affect the resistance and stability of the existing building and DO NOT modify its seismic safety level. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/750495-2026) -
Romania – Solar panel roof-covering work – Technical project development, DTAC, execution details, technical assistance to the designer, technical check and execution of works for the investment objective «INFRASTRUCTURA DE PRODUCERE ENERGIEI REGENERABILE PENTRU SPITALUL JUDETEAN DE URGENTA «SFANTUL APOSTOL ANDREI» GALATI»
Description: Technical project preparation services, execution details, technical assistance from the designer, technical verification, and execution of works for the investment objective “INFRASTRUCTURE FOR PRODUCING RENEWABLE ENERGY FOR THE JUDICIAL EMERGENCY HOSPITAL “SAINT APOSTLE ANDREW” GALATI” The duration of the technical project preparation, execution details, technical assistance from the designer, technical verification, and execution of works services, and the technical documents necessary to obtain Approvals/Agreements/Authorizations, shall be 60 days from the Service Commencement Order. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/750563-2026) -
Romania – Construction work for power plant – Project Design and Execution of Works for Investment Project: "Photovoltaic Park on the Site of Bihor Episcopia Ash and Coal Storage – Phase I"
Description: Design and Execution of Works for the Investment Project: „Photovoltaic Park on the Ash and Ash Deposit Site of Bihor Episcopate – Phase I”, Unique Registration Code: 4230487/2025/115 Phase 1 - Obtaining approvals, agreements, authorizations + Technical Design + Execution Details + Technical Design Verification – Completion Term – 4 months from the date the contract enters into force and the Issue of LOI. ...