UK (1)
-
Stotfold Cemetery - Toilet and Storage
Description: Stotfold Town Council is seeking tenders from suitably experienced contractors to undertake renovation works to the Cemetery Toilet Block to provide 2 unisex WCs one of which to be DDA compliant, solar panels and battery to support trace heating and storage space.
(Retrieved from: https://www.find-tender.service.gov.uk/Notice/097682-2026)
Pre-Application advice has been received from Central Bedfordshire Council detailing requirements of the works. ...
EU (17)
-
Croatia – Construction work for school buildings – Radovi izgradnje PŠ Josipa Generalića Hlebine sa školskom sportskom dvoranom
Description: Construction of a school building with a gross building area of approximately 650 m2 (ground floor and floor, height to eaves approximately 8.9 m, total height approximately 9.9 m), and construction of an expanded school gymnasium with a gross building area of approximately 200 m2 (height to eaves approximately 5.5 m, total height approximately 8.5 m). Photovoltaic cells are installed on both objects (installed power - 100.00 kVA). The buildings are constructed on a plot with a total area of approximately 4500 m2. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/713714-2026) -
Czechia – Solar panels – Construction of a photovoltaic power plant in the village of Přibyslavice
Description: The subject of the public procurement is the construction of a new ground-based photovoltaic power plant (FVE) with a capacity of 966 kWp and a large-capacity battery storage with a capacity of 500 kW and usable capacity min. 500 kWh on an open area in the cadastral area of Přibyslavice u Velké Bíteše.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/711884-2026) -
Czechia – Solar photovoltaic modules – FVE VAS, ÚV Znojmo a ČOV Dobšice
Description: The subject of the public procurement is the construction of photovoltaic power plants and battery storage facilities in two areas of the procuring authority, according to this tender documentation and their appendices. The procuring authority will conclude a contract with the selected supplier. The subject of the public procurement is the procurement, construction, and installation of a photovoltaic power plant and a battery storage facility in the area: water treatment plant Znojmo (hereinafter referred to as "WTZ Znojmo") with a total permitted output of 332.64 kW, a number of 616 ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/714801-2026) -
France – Engineering design services for mechanical and electrical installations for buildings – Missions de Maîtrise d'oeuvre pour des travaux d'installation de production d'Energies Renouvelables sur les bâtiments publics du Var
Description: Lot n°1: Management for solar photovoltaic installations on roofs and awnings
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/715005-2026)
TE83 portal on behalf of its member municipalities for energy renovation projects of public buildings in Var under management mandate. The present contract covers 3 management missions for: - Solar photovoltaic installation works on roofs and awnings; - Solar thermal system installation works; - Biomass heating plant installation works -
Germany – Solar installation – Installation of PV system Site ÜE1 UKSH Kiel
Description: The subject of the contract includes the turnkey execution planning, delivery, installation, commissioning, and maintenance of the photovoltaic systems on the flat roof of the ÜE1 building of the University Hospital Schleswig-Holstein (UKSH) in Kiel.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/712190-2026)
Stadtwerke Lübeck Energie GmbH intends to award a contract for the turnkey execution planning, delivery, installation, commissioning, and maintenance for a PV system at the UKSH Kiel location. -
Germany – Construction work – Tender for PV system, roof area "Airport" (Trade 442) for the new AKK building
Description: The Altona Children's Hospital consists of several buildings and thus several roof surfaces of various construction types. Due to existing regulations and the hospital's internal process for energy optimization, it has been decided to gradually equip the existing roof surfaces with PV systems. The PV systems are exclusively for self-consumption with surplus feed-in. As part of a previous measure, the roof surface of the main building has already been equipped with a PV system. As part of the measure to expand the airport, the roof surface of the airport is also to be equipped with a PV system. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/712428-2026) -
Germany – Electrical wiring and fitting work – POM / Municipal housing construction with underground garage in Eching - VE25 Photovoltaic systems
Description: Establishment of a photovoltaic system with approximately 40 modules on a green flat roof. The substructure will be erected by the AN roof防水者, the AN PV will carry out the installation of the modules, inverter, and cabling of the system. 40 units of modules 1 unit of inverter 750m solar cables 1x6mm²
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/713272-2026)
New construction of 19 apartments in municipal housing with underground parking and ancillary buildings -
Germany – Solar energy – Solar installations each 180 - 200 kWp
Description: Delivery DDP Germany (200 km radius around Eschborn, exportable), Installation description Address will be defined by GIZ after award.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/713294-2026)
per lot: 5 solar systems with each 180 to 200 kWp PV and 900 kWh storage -
Germany – Architectural, construction, engineering and inspection services – PV-Dachcheck - Review roof suitability within the framework of DBS Preparatory services for photovoltaic projects
Description: Under the tendering procedure of the Dynamic Procurement System (DBS), roof inspection services shall particularly be procured for the assessment of roof suitability for photovoltaic systems (photovoltaic system roof inspection).
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/713412-2026) -
Italy – Solar panel roof-covering work – PROCEDURA APERTA PER L’AFFIDAMENTO REALIZZAZIONE DI IMPIANTI FOTOVOLTAICI SUI LASTRICI SOLARI DEGLI IMMOBILI DI ARCA JONICA NEI COMUNI NELL'AREA SUD-EST DI TARANTO PER LA CONDIVISIONE DELL'ENERGIA ALL'INTERNO DELLA COMUNITA' ENERGETICA CER Gesuiti, MEDIANTE FINANZA DI PROGETTO AI SENSI DEGLI ARTT. 193 E SS. DEL D.LGS. 36/2023, A VALERE SULLA MISSIONE 2, COMPONENTE 2, INVESTIMENTO 1.2 (M2.C2.-I1.2)
Description: PROCEDURE OPEN FOR THE CONTRACTING OF PHOTOVOLTAIC SYSTEM INSTALLATIONS ON SOLAR BLINDS OF ARCA JONICA BUILDINGS IN THE TOWNSHIPS IN THE SOUTHEAST AREA OF TARANTO FOR ENERGY SHARING WITHIN THE CER Gesuiti ENERGY COMMUNITY, THROUGH PROJECT FINANCE IN ACCORDANCE WITH ARTS. 193 AND FOLLOWING OF DECREE-LAW 36/2023, VALUED ON MISSION 2, COMPONENT 2, INVESTMENT 1.2 (M2.C2.-I1.2) – RENEWABLE PROMOTION FOR ENERGY COMMUNITIES AND SELF-CONSUMPTION – NEXT GENERATION EU INITIATIVE
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/712941-2026) -
Poland – Electric accumulators – Construction of OZE infrastructure for the development of the functioning of the Energy Cluster Brama Podhala – hydrogen energy storage demonstration project
Description: 1. The subject of the contract is the design, delivery, installation, and commissioning of a hydrogen energy storage installation from RES together with a photovoltaic energy generation installation, further referred to as „Installation”. 2. The subject of the contract is the design, delivery, installation, integration, and commissioning of a hydrogen technology-based energy storage demonstration installation within the system. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/711733-2026) -
Poland – Solar photovoltaic modules – „Construction of a photovoltaic installation for electric buses within the municipal transport base”. The order will be implemented as part of the project: „Improvement of public transport within the Northern City Functional Area – purchase of ecological rolling stock and modernization of transport infrastructure” co-financed by the European Regional Development Fund (...)
Description: The main scope of the order includes: Construction of a photovoltaic system with a power of 149.94 kWp with an energy storage system with a power of 200 kW and a minimum capacity of 500 kWh. Photovoltaic modules with a power of 490Wp each in a quantity of 306 pcs will be mounted on a system-level freestanding structure. The photovoltaic system will be equipped with three hybrid inverters, each with a power of 50 kW. The system will be equipped with AC and DC distribution boards along with protections. Cable routes for the AC, DC and communication sides will be implemented. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/711923-2026) -
Poland – Solar panels – Construction of renewable energy sources in the territory of Włodowice City and Municipality (II procedure)
Description: 1. The subject of the contract is the execution of the project documentation and the comprehensive execution of the investment task titled „Construction of Renewable Energy Sources on the Territory of the City and Gmina of Włodowice”. The contract consists of designing and implementing the supply, installation, and commissioning of installations: photovoltaic - 51 units, energy storage – 51 units. 2. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/712291-2026) -
Poland – Solar photovoltaic modules – Investment activities in the construction of infrastructure of the Energy Cluster of Gminy Odolanów, Przygodzice, Sulmierzyce - delivery and installation of RES for public utility facilities
Description: 1. The subject of the contract is the comprehensive implementation of the task in the "design and construct" formula, particularly including: 1) developing a separate technical project for each location covered by the contract, along with obtaining the required approvals and submitting construction work notifications that do not require a building permit to the competent architectural and construction administration authority, if such an obligation arises from legal provisions; ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/714501-2026) -
Portugal – Solar panel roof-covering work – EMPREITADA - CAMPUS DO PRAGAL - INSTALLATION OF PHOTOVOLTAIC PANELS FOR ELECTRICITY SELF-CONSUMPTION
Description: CONTRACTOR - PRAGAL CAMPUS - INSTALLATION OF PHOTOVOLTAIC PANELS FOR ELECTRIC ENERGY SELF-CONSUMPTION
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/713518-2026)
CONTRACTOR - PRAGAL CAMPUS - INSTALLATION OF PHOTOVOLTAIC PANELS FOR ELECTRIC ENERGY SELF-CONSUMPTION -
Romania – Solar installation – Supply and installation of 2.7 Kw photovoltaic system with DS Arges storage
Description: 1 off-grid photovoltaic system with storage, fully equipped, with the minimum composition: at least 6 pieces of monocrystalline N-Type panels of at least 460 Wp (minimum installed power of 2.76 kWp); 1 piece of single-phase hybrid inverter of at least 6 kW; 1 piece of LiFePO4 accumulator of at least 11.7 kWh, with an integrated heating system; 1 set of metal mounting structure for ground installation; DC and AC protections; solar cables, connectors, AC cables and grounding; earth socket (execution and measurement); ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/713229-2026) -
Slovakia – Construction work – Improvement of energy efficiency and renovation of public buildings – STVR Bratislava, ŠB Mlynská dolina
Description: The subject of this part of the contract is the selection of a contractor to ensure installation, assembly, and construction work required for the replacement of lighting and related electrical installation work, with the overall goal of reducing primary energy consumption. The subject of this contract is construction work focused on reducing the energy demand of the STVR – Studio Block, in the STVR Mlynská Dolina area in Bratislava (k.ú. Karlova Ves, LV č. 183, parc. č. 2920/6). ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/712680-2026)