UK (1)
-
SBC Minor Works Framework 2026
Description: Stockton on Tees Borough Council (the Authority) would like to establish a new Open Framework of contractors covering a broad range of minor works. Framework contractors will be required to carry out minor works and services to a range of commercial and
(Retrieved from: https://www.find-tender.service.gov.uk/Notice/095917-2026)
domestic properties within the Borough as and when required on a call off basis, either by direct award or via a further competition.
The final proposal is to create a new multi-supplier framework for the provision of minor works.
The Authority's detailed requirements are defined in the Specification document. ...
EU (11)
-
Croatia – Hospital facilities construction work – IZGRADNJA NOVOG OBJEKTA DOMA ZDRAVLJA ZAGREB - ZAPAD - AMBULANTA ŠPANSKO
Description: CONSTRUCTION OF A NEW HEALTHCARE FACILITY ZAGREB - WEST - AMBULATORY SPANISH CPV code and name: 45215140-0 The subject of the public procurement is the execution of works on the construction of the Zagreb West Healthcare Facility - Spanish Ambulance, at the location k.č.br. 5363/3 k.o. Donje Vrapče, in Zagreb. A standalone public and social - healthcare building is planned to be constructed, designed as a modern healthcare facility in a compact form with one underground and three above-ground floors (Po+Pr+2). ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/702326-2026) -
Czechia – Solar energy – „Renovation of the facility into an Alzheimer's center – FVE Contractor"
Description: The subject of the contract is to ensure the delivery, installation, and commissioning of a photovoltaic power plant (hereinafter also referred to as "FVE") within the permitted project for the renovation of the object into a social care facility - Alzheimercentrum, Čeňka Zemana 431, Černčice u Loun, including a battery storage system on a key, including training for the responsible staff of the client, and including related engineering activities. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/700400-2026) -
Germany – Solar energy – Solar installations each 38.4 kWp
Description: Delivery DDP Germany (200 km radius around Eschborn, exportable), Installation description Address will be defined by GIZ after award.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/700575-2026)
per batch: 50 solar systems with 38 kWp PV each and 60 kWh storage -
Germany – Electrical wiring and fitting work – Adam-Kraft-Straße 2 - Starkstromanlagen
Description: Electrical engineering: Renovation of a school building from ground floor to 2.OG in two construction phases. Installation of electrical systems. Facility technology: NSHV with 2 main distribution boards, approx. 16 sub-distribution boards and approx. 20 table small distribution boards. Photovoltaic system with 54 modules.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/701579-2026) -
Poland – Solar installation – Delivery and installation, commissioning and integration of energy autonomy systems for public utility objects of the City of Gdańsk Municipality – stage II
Description: 1. The subject of the contract is the delivery of new off-the-shelf, installation, commissioning, and integration of energy autonomy systems for the following public utility objects of the City of Gdańsk Municipality – stage II: 1) Energetic Schools Complex, M. Reja Street 25, Gdańsk, PPE number 590243831006875748, meter number 53997984, 2) Sports Schools and Sports Masters Complex, Subisława Street 22, Gdańsk, PPE number 590243831009311038, meter number 53998071, 3) Elementary School No. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/700352-2026) -
Poland – Solar energy – Delivery with installation of photovoltaic panels (ul. Oleska 125)
Description: The procedure will be conducted as an unlimited tender based on Art. 132 of the Public Procurement Act. 2. The Purchaser intends to use the procedure described in Art. 139 of the Public Procurement Act (Pzp), i.e., first to examine and evaluate bids, and then to perform subject qualification of the contractor. List of declarations submitted by the Contractor for preliminary confirmation that it is not subject to exclusion and meets the conditions for participation in the procedure: According to Art. 139 para. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/701956-2026) -
Poland – Solar energy – Delivery and installation of OZE systems for residents and Public Utility Buildings for the Gmina and City of Odolanów
Description: Delivery and installation of photovoltaic panels and energy storage systems for SECTOR 1 - ODOLANÓW. I. Description: Part 1 of the task consists of the delivery and installation of photovoltaic panels with a total power of 775.40 kWp and energy storage systems with a total capacity of 1258 kWh for 199 households of residents of the Gmina and City of Odolanów. The Buyer specifies: - approximate number of installations placed on residential/commercial/garage building roofs - 168 installations, - approximate number of installations placed on land – 31 installations. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/702556-2026) -
Poland – Solar photovoltaic modules – Delivery and installation including the design and commissioning of a 450 kWp photovoltaic system as part of the grant application titled: Development of decentralized energy based on RES for public utility buildings in Zawiercie Gmina
Description: 1. The subject of the contract is the supply and installation, including the design and commissioning of a photovoltaic installation with a power of 450 kWp within the grant application titled: Development of decentralized energy based on RES for public utility buildings in Zawiercie Commune. 2. The subject of the contract is the design of the photovoltaic installation and the execution of construction and engineering works for electrical and mechanical equipment designed by the Contractor. 3. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/702846-2026) -
Poland – Solar installation – Partnership Programs of Municipal OZE for Świdnica County (PPEK I)
Description: The subject of the contract is the delivery and installation of hybrid photovoltaic microinstallations, including energy storage systems and an integrated management system connecting production systems with the Polish energy market, intended for operation in buildings and properties belonging to the Strzegom Municipality (7 locations) namely: 1) the building of the Public Kindergarten No. 2 named Bear Cubs at Mickiewicza 2A in Strzegom, 2) the building of the Public Primary School No. 2 named Nicolaus Copernicus at Mickiewicza 1 in Strzegom, 3) the building of the Public Primary School No. ... ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/703382-2026) -
Portugal – Solar installation – Supply, installation and maintenance of photovoltaic production plant
Description: Procedure for public competition for the supply, installation and maintenance of a photovoltaic production plant. Procedure for public competition for the supply, installation and maintenance of a photovoltaic production plant.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/700588-2026) -
Romania – Solar photovoltaic modules – Sistem fotovoltaic cu stocare - DS Tulcea
Description: Sistem fotovoltaic cu stocare - DS Tulcea, conform caietului de sarcini.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/700569-2026)
Sistem fotovoltaic cu stocare - DS Tulcea, conform cerintelor caietului de sarcini. Numar zile pana la care se pot solicita clarificari inainte de data limita de depunere a ofertelor/candidaturilor: 15. Autoritatea Contractanta va raspunde in mod clar si complet tuturor solicitarilor de clarificari cu 10 zile inainte de termenul limita stabilit in Anuntul de participare pentru depunerea ofertelor.