Croatia – Solar photovoltaic modules – Installation of solar plants at Delta parking lot
Description: The subject of the procurement is a mixed procurement of goods with accompanying works and services, where the dominant part of the subject of the procurement is the delivery and installation of equipment for a photovoltaic power plant on the canopies of the parking lot of Srednja Delta, at the location Srednja Delta, Rijeka, k.č.br. 4645/1, k.o. Stari Grad.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/688458-2026) -
Czechia – Solar panels – INSTALLATION OF PV SYSTEMS ON SCHOOLS AND kindergartens SOLNICE
Description: The subject of the public procurement is the supply and installation of photovoltaic power plants on the roofs of buildings in the area of Solnice Primary School and the roof of the building in the area of Solnice Kindergarten, using the Design & Build method, including the connection of FVE to the supplier's distribution system, respectively its subsidiary organizations, and securing the necessary permits and licenses for their operation. The total designed output of FVE is 154.8 kWp, of which on objects in the ZŠ area (including the school canteen building) in total: 82. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/689392-2026) -
Czechia – Solar photovoltaic modules – Fotovoltaická elektrárna pro sklad sena a pavilon afrických kopytníků
Description: The subject of the public procurement is the construction of a new photovoltaic system, which ensures significant savings on electricity costs. The subject of implementation are two facilities: the African ungulates pavilion and the grain storage in the Radčická area.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/685967-2026) -
Czechia – Solar installation – Fotovoltaická elektrárna Jindřichův Hradec, Jarošovská 746
Description: The subject of the public procurement is the construction of a photovoltaic power plant with an installed capacity of 99 kWp + DC/AC 3f 2x inverter 45 kW on the roof of a primary school at the address: Jindřichův Hradec, Jarošovská 746/II, located on the pavilion of first-grade classrooms (p.č. 2497/4) and the school canteen pavilion (p.č. 2497/5), with its connection to a new substation via the plot p.č. 2497/3. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/686775-2026) -
Czechia – Solar installation – Uničov - photovoltaic power plant in TS Uničov and at the municipal swimming pool - OPAKOVÁNÍ
Description: The subject of the public procurement contract is the delivery, installation, and commissioning of FVE on two (2) existing objects of the client, namely the Technical Services facility of the city of Uničov and the public swimming pool facility in the city of Uničov, including static securing of roof structures.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/687776-2026) -
Germany – Roof insulation work – EGS-EGHO_Dachabdichtung
Description: Item 1: Slope insulation approx. 480m2 extensive green roof approx. 480m2 fall protection rope system approx. 100lfm PV substructure approx. 40 St Roof waterproofing work
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/689910-2026) -
Germany – Construction work for school buildings – Fassadensanierung am Lichtenberg Gymnasium Cuxhaven
Description: Installation einer Photovoltaikanlage
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/689992-2026)
Installation einer Photovoltaikanlage -
Ireland – Solar energy – 0053-Supply and Installation of Solar Panels
Description: Background: An Post is establishing a Qualification System for the provision of the Supply and Installation of Solar Panels Nationwide. While the primary focus of this procurement is on Supply and Installation services, An Post reserves the right to seek support, maintenance, and/or ongoing enhancement services at a later stage in any call off tender, inclusion of this provision does not imply any commitment or guaranteed volume from An Post. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/685982-2026) -
Netherlands – Solar panels – Leveren en plaatsen PV-installaties op de terreinen van RWZI Den Helder, Baggerdepot Oostoever en (optioneel) Balgzannd
Description: De aanbestedingsprocedure betreft een Opdracht voor het leveren en plaatsen van PV-installaties in veldopstellingen op drie terreinen in de Noordkop van Noord-Holland: RWZI Den Helder, voormalig baggerdepot Oostoever, Balgzand (optioneel). Door de nabijheid van het militaire vliegveld Kooijmeer mogen er op alle locaties alleen glasloze kunststof pv-panelen geleverd worden om te voorkomen dat het vliegverkeer hinder ondervindt van eventuele schittering van de panelen. De specificaties die Aanbesteder aan deze panelen stelt zijn in de Werkomschrijving opgenomen. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/690654-2026) -
Poland – Photovoltaic cells – Renewable energy - photovoltaic installations in public utility facilities within Mikołów Community - stage II.
Description: The subject of the contract includes the supply and installation of photovoltaic systems on public utility buildings for the task „Renewable energy sources – photovoltaic installations on public utility buildings within Mikołów Municipality - stage II” in the following locations: schools SP-1 ul. Konstytucji 3-Maja 20(15,3kWp), SP-3 ul. Bandurskiego 1 (18,9kWp), SP-5 ul. Katowicka 24 (13,02 kWp), SP-6 in ZSP 3ul. Gliwicka 299 (11,62) , SP-7 ul. Zamkowa 1 (22,95 kWp), SP-8 ul. Wolności 27 (4,28+22,525+11,05 kWp), SP-10 ul. Krakowska 30 (49,98+25,5 kWp), kindergartens P-1 ul. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/689693-2026) -
Poland – Battery packs – Energy storage for existing photovoltaic installations for residential and public buildings in Opinogóra Górna municipality
Description: 1 The subject of the contract is the execution of project documentation and the comprehensive implementation of the investment task, including the supply, installation, and commissioning of energy storage systems. 2 The contract consists of: 1) conducting necessary formal and legal procedures and obtaining required permits, licenses, resolutions, or administrative decisions; 2) conducting necessary formal and legal procedures and obtaining required changes to connection conditions to the distribution network; ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/691242-2026) -
Poland – Solar photovoltaic modules – Construction of OZE infrastructure for the development of the functioning of the energy cluster of Nowosądecki County South – photovoltaic installations, energy storage and CWU and CO heat pumps
Description: The subject of the contract is the construction of OZE infrastructure for the development of the functioning of the Południe Energy Cluster of Nowy Sądecczyzn County – photovoltaic installations, energy storage and CWU and CO heat pumps in private buildings. The contract consists of designing, delivering, installing, and commissioning: 1. For Gmina Stary Sącz: a) 79 photovoltaic installations with hybrid inverter and energy storage, b) 85 photovoltaic installations with hybrid inverter without energy storage, c) 29 energy storage installations with hybrid inverter. 2. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/691598-2026) -
Poland – Solar photovoltaic modules – „Renewable energy sources in the Brzeziny commune - III edition”
Description: 1. The subject of the contract is the performance of the task titled: “Renewable Energy Sources in Brzeziny Municipality - III Edition”. The project will be implemented under the "design and construct" system. The subject of the contract is being implemented as part of: Project FELD.02.06-IZ.00-0007/25 implemented under FELD.02.06 Action: Renewable Energy Sources – ZIT Łódzki Metropolitan Area within the Priority: European Funds for Green Łódź, Program: European Funds for Łódź 2021-2027. 2. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/691683-2026) -
Poland – Solar installation – „Partner Energy Programs of Municipal OZE for Świdnica County Gmines (PPEK I)”
Description: The subject of the order is the delivery and installation of hybrid photovoltaic microinstallations including energy storage systems and a management system integrating production systems with the Polish energy market, intended for operation in buildings and properties belonging to the Strzegom Municipality (7 locations) namely: - the building of Kindergarten No. 2 at Mickiewicza 2a Street in Strzegom, - the building of Primary School No. 2 at Mickiewicza 1 Street in Strzegom, - the building of Primary School No. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/691723-2026) -
Poland – Electricity, heating, solar and nuclear energy – Installation of photovoltaic systems and heat pumps within the project „Implementation of RES in organizational units of Gliwicki County - stage I” co-financed by the European Union
Description: Part 1 - Family Home for Children in Bojszów: a) Photovoltaic installation with a power of 25.76 kWp with an energy storage of 15 kWh, b) Heat pump with a power of 18 kW;
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/692200-2026)
Type of order: The mixed order includes services (project work), deliveries (device delivery), and construction work (installation work), where the main service in the existing factual situation are deliveries. ... -
Poland – Solar photovoltaic modules – „Installation of RES systems in the area of Mokrsko Gmina”- repeat
Description: 1. The subject of the contract is the performance of the task entitled: „Installation of RES in Mokrsko Municipality”. The subject of the contract is being implemented within the framework of: Project FELD.02.05-IZ.00-0071/23 implemented within the framework of FELD.02.05 Action: Renewable energy sources within the Priority: European funds for green Łódź, Program: European funds for Łódź 2021-2027.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/686403-2026)
2. ... -
Poland – Works for complete or part construction and civil engineering work – Construction of a multi-family building at ul. Armii Krajowej in Strzegom
Description: The subject of the contract is the construction of a multi-family residential building at Armii Krajowej Street in Strzegom, including equipment, necessary infrastructure, and land development on plots with cadastral numbers 767/11, 769/1 and 769/2, district 0003 Śródmieście Nr 3, including connections and internal networks on plots with cadastral numbers 767/12, 768, 767/9, district 0003 Śródmieście Nr 3, including obtaining a user permit. As part of the contract, it is planned to construct a residential, multi-family, unbasement building with a useful area of 2217.60 m². ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/687566-2026) -
Poland – Solar photovoltaic modules – Use of renewable energy in Kawęczyn community through installation of photovoltaic systems and solar collectors
Description: Part I of the order: supply and installation of photovoltaics and energy storage in the design and build format: 1) the entire task, i.e. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/687971-2026) -
Poland – Solar photovoltaic modules – „Renewable Energy Sources within Ujazd Municipality”
Description: 1. The subject of the contract includes Part no. 1: Renewable energy sources in private buildings • 72 units of photovoltaic installations with energy storage for individual residents. 2. The subject of the contract is described in detail in: for part no. 1: in the functional-user program, which constitutes Appendix no. 6 to the SWZ.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/688453-2026)
1. The subject of the contract is the execution of a task within the project titled: „Renewable Energy Sources in the Ujazd Municipality”. ... -
Poland – Solar energy – Delivery and installation of OZE systems for residents and public buildings for the Gmina and City of Odolanów
Description: Delivery and installation of photovoltaic panels and energy storage for UNIT 1 - ODOLANÓW . I. Description: Part 1 of the task consists of the delivery and installation of photovoltaic panels with a total power of 775.40 kWp and energy storage systems with a total capacity of 1258 kWh for 199 households of residents of the Gmina and City of Odolanów. The Purchaser specifies: - approximate number of installations placed on residential/commercial/garage building roofs - 168 installations, - approximate number of installations placed on land – 31 installations. ...
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/688586-2026) -
Spain – Solar photovoltaic modules – Supply for the expansion of the photovoltaic energy and storage installation and the incorporation of wind energy in the Urioste Fire and Rescue Station of the Bizkaia Provincial Council.
Description: Lot 1 - PHOTOVOLTAIC, STORAGE AND GLOBAL MONITORING
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/692604-2026)
Supply for the expansion of the photovoltaic energy installation and storage and the incorporation of wind energy in the Urioste Firefighters and Firewomen Park of the Basque Country Provincial Council. -
Spain – Architectural, construction, engineering and inspection services – proyectos y direcciones de obra de ejecuciones de obra de CEIP NUEVO, EDIFICANT (Reunificación centros)
Description: Technical assistance service for drafting the basic and execution project, of the installation projects, of the safety and health study, of the quality control program and for construction direction, installation direction, execution direction of the work, safety and health coordination during work execution, and quality control monitoring of the CEIP NUEVO works, included in Edificant (Center reunification: EI San Rafael, CEP 9 D'Octubre and CEP Rei En Jaume) construction (replacement) by reunification of existing centers, on a different plot.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/688797-2026) -
Switzerland – Solar energy – STEP ORBE BETELEC - Supply and installation of photovoltaic panels
Description: This contract concerns the implementation of a photovoltaic installation on 5 roofs of the STEP d'Orbe. The services include notably the supply, installation, connection, and commissioning of the photovoltaic installations.
(Retrieved from: https://ted.europa.eu/en/notice/-/detail/687680-2026)