Concrete Volume & Cost Calculator

— Professional concrete quantity and cost estimation for solar light foundations













Live Demo — Concrete Volume & Cost Calculator

Enter your foundation shape, depth and concrete unit price to get the volume, purchase quantity and cost estimate instantly.

Concrete Volume & Cost Calculator

Free professional concrete volume and cost calculator for solar street light foundations. Input the square or circular foundation dimensions, buried depth, above-ground height, loss factor and C30 concrete unit price to compute the concrete volume in ft³ and yd³, the purchase quantity including pouring loss, and the estimated cost.

Key Features

Foundation Type

Choose a square (length × width) or circular (diameter) foundation cross-section with dimensions from 0.3 ft upward.

Depth Parameters

Set the buried depth h, the above-ground pedestal height h_top and the pouring loss factor to model the full concrete block.

Cost Parameters

Enter the C30 concrete unit price in $/yd³ (including delivery and pumping fees) to drive the cost estimate.

Volume Calculation

Computes V = L × W × (h + h_top) for square blocks and V = π/4 × D² × (h + h_top) for circular blocks.

Purchase Quantity

Applies the loss factor (V_purchase = V × 1.05) and converts the result to cubic yards for ordering ready-mix concrete.

Cost & Reference

Estimates cost as yd³ × unit price and shows a reference table of common foundation sizes for 19.7-39.4 ft poles.

Technical Specifications

Platform HTML5 Web App | Android (via WebView)
Core Calculation V = L × W × (h + h_top); V_purchase = V × 1.05; Cost = V(yd³) × price
Foundation Shape Square (L × W) / Circular (D), ≥ 0.3 ft
Buried Depth ≥ 0.3 ft (default 3.3 ft)
Above-Ground Height 0 - 20 ft (typical 0.7 ft)
Loss Factor 0 - 20% (default 5%)
Concrete Grade C25 / C30 (2400 kg/m³ ≈ 150 lb/ft³)
Unit Price $ / yd³ (1 yd³ = 27 ft³)
Industry Standards EN 206, ACI 211.1
Output Concrete volume (ft³ & yd³), purchase quantity, cost estimate

Frequently Asked Questions

What does the loss factor cover?

The loss factor (typically 5%, applied as V × 1.05) covers pouring losses, formwork leakage and leftover mix when ordering ready-mix concrete. It converts the theoretical geometry volume into the quantity you actually need to purchase.

Why include the above-ground height h_top?

The anchor-bolt pedestal rises slightly above grade (typically 0.3-0.7 ft), and concrete is needed for that part too. The volume is calculated over the full height (h + h_top) times the plan area, so leaving out h_top would under-order concrete.

How is the cost estimated?

The purchase volume in cubic yards (V × 1.05 converted by 1 yd³ = 27 ft³) is multiplied by the unit price. For example, a 3.61 × 3.61 × 3.94 ft block needs about 2.16 yd³; at $47.8/yd³ that is roughly $103.

What does the cement content figure mean?

The cement content estimate uses about 23.7 lb of C30 cement per cubic foot of concrete, roughly matching a 1 : 1.42 : 3.23 : 0.47 mix ratio with 42.5 ordinary Portland cement. It helps when ordering bagged cement or confirming ready-mix proportions.